Energy Pod – 199kW Oswestry

400kW containerised Biogas Boiler

The client required two 199kw boilers, one to deliver process heat for the production of gas and pasteurisation and the other delivering heat to a dryer and heat to a local dairy operation.

 

199kW biogas boiler Shaw Renewables Biomass Biogas renewable energy 199kW biogas boiler Shaw Renewables Biomass Biogas renewable energy

 

We delivered a 40ft plant room with 2no. self contained plant rooms inside – each housing a 199kw boiler delivering heat into large heating manifolds.

The client took advantage of our Oil hire burners and we used both boilers to deliver heat to the biogas plant for the startup process.

Once the plant was producing Biogas the oil burners were off hired and the boilers where commission to run on Biogas.

Shaw Renewables Biogas Boiler

Sector:          Agricultural

Location:      Oswestry

Fuel:              Biogas 

FUEL CONSUMPTION:

80m3/hr Biogas

SERVICES PROVIDED:

  •  Design of RHI compliant system
  •  Installation and commission of 2no. containerised 199kW biogas boiler
  •  Connection of system
  •  Installation of Pipework

PLANT ROOM:

2 containerised plant rooms house:

  • 2no. 199kW Viessmann Vitoplex Boilers 
  • Manifolds
  • Pressurisation Units

HEAT USAGE:

Process heating:

  • Pasteurisation Unit

Space Heating:

  • Dairy

More Energy Pod Projects…