Energy Pod – 199kW Wiltshire

199kW Containerised Biogas Boiler

Our Client wanted to increase their heat production and make their biogas plant more profitable – the Shaw Renewables Energy Pod was the ideal solution.

We delivered the plant room to site in a compact 10ft container which was ready to connect to the client’s AD plant controls.

The 199kw Biogas Energy Pod is one of our basic models, soft commissioned and ready to go when delivered to site the unit includes boiler, flue, booster, Loading pump, shunt pump, pressurisation unit, expansion vessel, 199kw PHE, RHI Heat meter, combustion ventilation, Distribution board, power and lighting.

Each unit comes having gone through our test procedure and ready to connect to your Gas and heating system on site.

These units are quick to turn around and can be delivered to site within 4-5weeks from order.

Shaw Renewables Biogas Boiler

Sector:          Agriculture

Location:      Wiltshire

Fuel:              Biogas

FUEL CONSUMPTION:

40m3/hr Biogas

SERVICES PROVIDED:

    •  Design of RHI compliant system
    •  Installation and commission of a containerised 199kW biogas boiler
    •  Connection of system
    •  Installation of Pipework

PLANT ROOM:

A containerised plant room houses:

      • 199kW Viessmann Vitoplex Boilers 
      • Pressurisation Unit
      • Pipework, fittings, meters, expansion vessel

HEAT USAGE:

Process heating:

      • various applications