Energy Pod – 400kW Wrexham

400kW Biogas Boiler

This Welsh farm was already benefiting from microgeneration, but contacted Shaw Renewables for a bioenergy solution that would make use of the excess biogas being produced by their biogas plant.

 

 

We designed a containerised Energy Pod system which combusted the plant’s excess biogas to generate heat – this heat is distributed by manifolds, sharing the thermal energy throughout the site via a heat network.

Two purpose built drying units (L-Enz Dryers) provide a combined drying capability of 520kW. The rest of the generated heat is used for multiple applications including providing space heating and DHW.

Installed into one 40ft container, 2 energy pod plant rooms, divided by a fabricated wall, each house a 199kW Viessmann boiler, biogas burner, all necessary ancillary controls, manifolds, pressure equipment and equipment to satisfy Ofgem metering requirements.

The Energy Pod was fabricated in our workshop over 6 weeks and shipped to site ready for connection to the client’s biogas plant controls.

 

 

 

RHI BIOGAS BOILERS RENEWABLE HEAT INCENTIVE

The customer is part of the Renewable Heat Incentive Scheme (RHI), benefiting from payments for 20 years.

You can find out more about the Government’s RHI scheme on the Ofgem website.

 

Shaw Renewables Biogas Boiler

Sector:          Agricultural

Location:      Wrexham

Fuel:              Biogas 

SERVICES PROVIDED:

  • Design of RHI compliant system
  • Installation and commission of 2no. containerised 199kW biogas boilers
  • Connection of system
  • Installation of Pipework
  • Installation of 2no. Drying Units
  • Procurement and installation of 2no. manifolds
  • Installation of ducting for drying units

PLANT ROOM:

A 40ft containerised plant room now houses:

  • 2no. 199kW Viessmann Vitoplex Boilers 
  • 2no. Manifolds 

HEAT USAGE:

Space heating and DHW:

  • Farm House

DHW:

  • Dairy

Process heating:

  • 2 Drying Units
  • Fermenter Tank