Energy Pod – 400kW High Offley

199kW Biogas Boiler

This Staffordshire based AD plant is now benefitting from increased thermal energy production and additional revenue into the business since installing an Energy Pod.

Shaw Renewables Energy Pod Biogas Boiler 0001 Shaw Renewables Energy Pod Biogas Boiler 0001
199kW biogas boiler Shaw Renewables Biomass Biogas renewable energy 199kW biogas boiler Shaw Renewables Biomass Biogas renewable energy
199kW biogas boiler Shaw Renewables Biomass Biogas renewable energy 199kW biogas boiler Shaw Renewables Biomass Biogas renewable energy
199kW biogas boiler Shaw Renewables Biomass Biogas renewable energy 199kW biogas boiler Shaw Renewables Biomass Biogas renewable energy
199kW biogas boiler Shaw Renewables Biomass Biogas renewable energy 199kW biogas boiler Shaw Renewables Biomass Biogas renewable energy
199kW biogas boiler Shaw Renewables Biomass Biogas renewable energy 199kW biogas boiler Shaw Renewables Biomass Biogas renewable energy

The boiler and all other plant equipment needed is housed in a 20ft shipping container built offsite and delivered to site ready to connect to their technology. The Energy Pod was delivered to the arable farmer’s anaerobic digestion plant just 6 weeks after the order was placed.

This plant houses a 5 way heating manifold, allowing heat from the biogas boiler and onsite CHP to be distributed to a dryer and one of the AD plant’s fermenter. The additional connection from the manifold is for a future heat network.

The external dryer transfers 85˚c hot water into force blown hot air, which is being used to dry wood chip which will be sold as biomass fuel, increasing our customer’s revenues further .

 

 

RHI BIOGAS BOILERS RENEWABLE HEAT INCENTIVE

The customer is part of the Renewable Heat Incentive Scheme (RHI), benefiting from payments for 20 years.

You can find out more about the Government’s RHI scheme on the Ofgem website.

 

Shaw Renewables Biogas Boiler

Sector:          Agriculture

Location:      Staffordshire

Fuel:              Biogas 

FUEL CONSUMPTION:

40m3/hr Biogas

SERVICES PROVIDED:

  •  Design of RHI compliant system
  •  Installation and commission of containerised 199kW biogas boiler
  •  Connection of system

PLANT ROOM:

A containerised plant room houses:

  • 1no. 199kW Viessmann Vitoplex Boilers 
  • Manifold
  • Ancillary equipment

HEAT USAGE:

Process heating:

  • Fermenter Tank
  • Drying Unit

Space Heating:

  • Not implemented at time of case study

DOWNLOAD BROCHURE

More Energy Pod Projects…